1. The company MSI PLUS has achieved with satisfaction the following works:
WORKS | UNIT | REGION |
BMH cooler (box plates) | CEMENT | Béni-Safi |
Cooler (Renovation and maintenance) | CEMENT | Béni-Safi |
Installation of Schenk dosages | CEMENT | Béni-Safi |
Elevators KK | CEMENT | Béni-Safi |
Auxiliary fireplaces | CEMENT | Béni-Safi |
Smoke box | CEMENT | Béni-Safi |
Renovation filter with handle | CEMENT | Ain-el-kebira |
Transporter 14P14&14/P15 | CEMENT | Hamma Bouziane |
BC I BC II Crushers | CEMENT | Hamma Bouziane |
Electro filtre BC I | CEMENT | Hamma Bouziane |
Bridge crane 1ST | PEPSI COLA | Setif |
Dosing schenk regulating regulation and setting up | CEMENT | Rais Hamidou Alger |
Assembly of a complete soap factory | ENCG | Port d'Alger |
Various stainless steel piping, black, boiler HP | ENCG | Port d'Alger |
F / installation of motorized curtains | ENCG | Port d'Alger |
Various PVC and polyamide pipes | ENCG | Port d'Alger |
Water treatment plant assembly | SAIDAL | Alger |
Assembly of a complete ointment manufacturing unit |
SAIDAL | Alger |
Renovation of the utility stations of Semmar units, El-Herrach | SAIDAL | Alger |
Greenfield | ORASCOM | Ain Abid |
Assembly of complete pylons (earth, lightning) | ORASCOM | Zighoud Youssef |
Shelter complete air conditioner radio equipment etc ... | ORASCOM | Didouche Mourad |
Supply and installation of automatic sliding gate | ORASCOM | Hamma Bouziane |
Seawater pumping station | ORASCOM | Constantine |
Electro-chlorination station | ENG | El Khroub |
Supply and installation of metal frame with sandwich panel cover | KUBOTA | Jijel |
insulin project | SONELGAZ | Jijel |
Realization of a sand treatment station | SAIDAL | Constantine |
Work on the electrification of a giant quarry 2006/2007 | SAIDAL | Benazzouz |
Power | BLZ | Constantine |
Order | ENG | El Malah |
Automatism | ENG | Ain Temouchent |
Supply & installation general and exterior lighting | ENG | Ain Temouchent |
PE pipe welding assembly treatment of siliceous sand | CEVITAL | Larbaa |
Supply and installation of a silicious sand treatment plant | BLZmines | Ben Azzouz |
Assembly of the utilities of a drug packaging factory | COGITELA | Constantine |
Installation of PP & PVC pipes desalination plant | GEIDA | Tlemcen |
Assembly of a sand pre-treatment plant 2011 | MFG | Tebessa |
Revision electro-filters | LAFARGE | M'sila |
Supervision trx electro-filters 200 & 600 and packaging tower | LAFARGE | M'sila |
Calcium carbonate steel pipe welding fitting assembly | SNC BENBRAHIM | ZI Ben Badis |
Manufacture and assembly 03 filters with handle | SNC BENBRAHIM | ZI Ben Badis |
Manufacture and assembly of metal structures | GIPLAT | Constantine |
Installation and repair of 02 boilers | HOTEL IBIS | Constantine |
Manufacture and assembly of piping and steam circuit collector | HUP PHARM | ZI Palma |
Carrying out maintenance work on lot N ° 09 (maintenance of aerografts stopped oven 1/2015) | CEMENT (S.C.H.B) | ZI Didouche Mourad |
2. The Company MSI PLUS has the following means:
3. Classification of the company:
The professional classification of enterprises or groups of enterprises is determined in accordance with the provisions of Article 7 of Executive Decree No. 93-289 of 28 November 1993, referred to above, on the basis of criteria such as:
èThe total number
èThe value of the material means of intervention own the company
èThe social capital
èThe turnover achieved in the construction, public works and hydraulic sector
èThe administrative certificates issued by the masters of works.